2026 Price Guide · Updated monthly

How much does a tiler cost in Stockton-on-Tees?

Experienced tilers for bathroom tiling, kitchen splashbacks, floor tiling, and mosaic work. Precision fitting with quality materials.

Last updated: May 2026 · Based on 8 Stockton-on-Tees listings

Average cost · Stockton-on-Tees

£23–£35/hr

Call-out: £40–£80 extra

Get a free quote

Prices by job type · Stockton-on-Tees 2026

Job typeTypical lowTypical highNotes
Bathroom wall tiling£450£950Indicative — final price depends on scope
Floor tiling£25£55Indicative — final price depends on scope
Kitchen splashback£180£400Indicative — final price depends on scope
Wet room tiling£800£1800Indicative — final price depends on scope
Mosaic feature walls£400£1200Indicative — final price depends on scope
Tile repair and re-grouting£120£350Indicative — final price depends on scope
Underfloor heating with tiles£1200£2800Indicative — final price depends on scope
External patio tiling£35£65Indicative — final price depends on scope

What affects the price?

📍

Location

Central postcodes typically cost 10–15% more than outer areas due to higher overheads.

Urgency

Emergency and same-day callouts attract a premium of £40–£80 on top of standard rates.

🔧

Complexity

Specialist work, structural changes or listed buildings increase labour time and cost.

📜

Certification required

Gas Safe, NICEIC or FENSA-registered work costs more but is legally required for certain jobs.

Prices by area in Stockton-on-Tees

AreaAvg hourly rateAvg job total
TS16£27/hr£122
TS17£27/hr£122
TS18£27/hr£122
TS19£27/hr£122
TS20£27/hr£122
TS21£27/hr£122

Frequently asked questions

Most tilers in Stockton-on-Tees charge £23–£35 per hour. Emergency callouts may add £40–£80 on top. Fixed-price quotes are available for defined jobs.

Tilers registered for VAT (turnover above £85,000) must charge 20% VAT. Sole traders below the threshold are VAT-exempt. Always ask for a VAT-inclusive quote.

Yes — we recommend getting at least 3 quotes. Domifyr makes this easy: submit one request and receive quotes from verified local tilers.

Most tilers ask for no more than 25% upfront, with the balance on completion. Never pay the full amount before work begins.