How much does a tiler cost in Stockport?
Experienced tilers for bathroom tiling, kitchen splashbacks, floor tiling, and mosaic work. Precision fitting with quality materials.
Prices by job type · Stockport 2026
| Job type | Typical low | Typical high | Notes |
|---|---|---|---|
| Bathroom wall tiling | £450 | £1200 | Indicative — final price depends on scope |
| Floor tiling | £380 | £950 | Indicative — final price depends on scope |
| Kitchen splashback | £280 | £650 | Indicative — final price depends on scope |
| Wet room tiling | £800 | £2200 | Indicative — final price depends on scope |
| Mosaic feature walls | £650 | £1800 | Indicative — final price depends on scope |
| Tile repair and re-grouting | £120 | £380 | Indicative — final price depends on scope |
| Underfloor heating with tiles | £1200 | £2800 | Indicative — final price depends on scope |
| External patio tiling | £950 | £2500 | Indicative — final price depends on scope |
What affects the price?
Location
Central postcodes typically cost 10–15% more than outer areas due to higher overheads.
Urgency
Emergency and same-day callouts attract a premium of £40–£80 on top of standard rates.
Complexity
Specialist work, structural changes or listed buildings increase labour time and cost.
Certification required
Gas Safe, NICEIC or FENSA-registered work costs more but is legally required for certain jobs.
Prices by area in Stockport
| Area | Avg hourly rate | Avg job total |
|---|---|---|
| SK1 | £35/hr | £158 |
| SK2 | £35/hr | £158 |
| SK3 | £35/hr | £158 |
| SK4 | £35/hr | £158 |
| SK5 | £35/hr | £158 |
| SK6 | £35/hr | £158 |
| SK7 | £35/hr | £158 |
| SK12 | £35/hr | £158 |
Frequently asked questions
Most tilers in Stockport charge £30–£46 per hour. Emergency callouts may add £40–£80 on top. Fixed-price quotes are available for defined jobs.
Tilers registered for VAT (turnover above £85,000) must charge 20% VAT. Sole traders below the threshold are VAT-exempt. Always ask for a VAT-inclusive quote.
Yes — we recommend getting at least 3 quotes. Domifyr makes this easy: submit one request and receive quotes from verified local tilers.
Most tilers ask for no more than 25% upfront, with the balance on completion. Never pay the full amount before work begins.